3.3 MWp Solar Project
Robi Axiata Limited - 280 Sites
Project Details
Date Installed: 01-Jan-2020
Capacity: 3.3 MWp.
Annual Energy Generation: 4215.75 MWh.
CO2 Reduction: 2987 tons per year.
Expected ROI: 4-5 years.
Client: Robi Axiata Limited
Location: 280 Sites
Completed on 1 January 2020, this 3.30 MWp solar installation was delivered by Cynergy Limited for Robi Axiata Limited in 280 sites nationwide. The system is projected to generate approximately 4,215.75 MWh of clean energy annually, reducing CO2 emissions by around 2,987 tons per year, with an expected payback period of 4-5 years.
Learn more about our solar EPC services.




