1.08 MWp Solar Project

Renata PLC, Rajendrapur

Project Details

Date Installed: On-Going

Capacity: 1.08 MWp.

Annual Energy Generation: 1380.46 MWh.

CO2 Reduction:  978.16 tons per year.

Expected ROI: 4-5 years.

Client: Renata PLC

Location: Rajendrapur

Scroll to Top