5.13 MWp Solar Project

Janata Jute Mills Ltd.

Project Details

Date Installed: 10-Aug-2024

Capacity: 5.13 MWp.

Annual Energy Generation: 6554.21 MWp.

CO2 Reduction: 4644 tons per year.

Expected ROI: 3.9 years.

Client: Janata Jute Mills Ltd.

Location: Faridpur

Completed on 10 August 2024, this 5.13 MWp solar installation was delivered by Cynergy Limited for Janata Jute Mills Ltd. in Faridpur. The system is projected to generate approximately 6,554.21 MWh of clean energy annually, reducing CO2 emissions by around 4,644 tons per year, with an expected payback period of 3.9 years.

Learn more about our solar EPC services or read why jute mills in Bangladesh are switching to solar power.

Janata Jute Mills is also home to Cynergy’s 758.4 kWp floating solar installation and 8.35 MWh battery energy storage system (BESS) — Bangladesh’s first large-capacity BESS.